EXECUTIVE BIOGRAPHY
JERRY HARDCASTLE

02.02.12
Share |

Vice President Vehicle Design & Development

Nissan Technical Center Europe

Jerry Hardcastle has spent 23 years working in the Automotive Industry holding positions in design and development with Austin Rover Group and Nissan Motors Limited.  Jerry has held positions in Engine Design, Interior Trim Design, Project Management and Vehicle Evaluation.

His current role as Vice President means Jerry is responsible for all aspects of the vehicle design and development activities and process at both NTCE sites based in Cranfield, Barcelona, Brussels, Bonn and Moscow. The position requires Jerry to perform locally within the European business operation, and globally within the Research and Development function maintaining responsibility for 4 European Directors and also acting himself as Director for Chassis Engineering.

During his career in Nissan, Jerry has lived and worked in Japan on two occasions, allowing him to experience the working cultures of Nissan in Japan and Europe.

Nationality: British

Born: 24 December 1961

Education: 
Msc Manufacturing Systems Engineering, University of Warwick
Bsc Engineering, Sheffield City Polytechnic

Career Profile:
2007 - Present   Vice President, Vehicle Design & Development
2004 – 2007  Director, Vehicle Evaluation & Experiment
2002 - 2004 Director, Project Management Office
2000 - 2002  General Manager & ACVE, Project Management
1999 - 2000 Manager, Primera Joint Development, NTC Japan
1997 - 1999 Manager, Trim & HVAC Design and Test
1992 - 1997 Senior Engineer, Engine Design
1989 - 1992 Engineer, Engine Design
1985 - 1989  Project Engineer, Engine Design, Austin Rover
1981 - 1985  Student Apprentice Engineer – Mining Mechanical, National Coal Board

 

Share |
Verwandte Inhalte
Fotos Alle anzeigen
Jerry Hardcastle
Jerry Hardcastle
*Wenn Sie alle verwandten Inhalte wünschen, wählen Sie das Kontrollkästchen "Alle hinzufügen". Alternativ können Sie auch die entsprechenden Kontrollkästchen für einzelne Medien, die Sie wünschen, aktivieren. Hinweis: Wenn keine Elemente ausgewählt wurden, fügen Sie durch Klicken auf "Hinzufügen" oder "Herunterladen" lediglich das Word-Dokument der Pressemitteilung hinzu.